Waste Water Collection System
Back to all ProjectsBURNS MAENDEL CONSULTING ENGINEERS was retained to design a wastewater collection system consisting of a fixed activated sludge treatment sewage plant and a total area disposal field.
This project consisted of:
- Designing the Infiltration Field and Monitoring Well Layouts
- Lift Station Design
- Specification of Treatment Technology
- Submission of an Environmental Act Proposal to Manitoba Conservation
- Engineering the Groundwater Monitoring and Effluent Sampling Plans
- Performing Construction Inspections and Completing Project Certification